A168/24
Relief from the Zoning By-law is being requested to permit the construction of a proposed warehouse building.
Relief from the Zoning By-law is being requested to permit the construction of a proposed warehouse building.
Relief from the Zoning By-law is being requested to permit increased height for Building A (Tower 1 and 2) and Building B, (Tower 3 and 4) as shown on the plans submitted with the application. Relief is also required to finalized related Site Plan Application DA.22.066
Relief from the Zoning By-law is being requested to permit a proposed swimming pool, accessory structure (fire pit) and reduced rear yard soft landscaping requirements.
Relief from the Zoning By-law is being requested to permit an addition to the existing dwelling. The addition to the existing dwelling is intended to provide a new garage and master bedroom.
Relief from the Zoning By-law is being requested to permit a proposed cabana and ground mounted pool equipment on the subject land.
You’re invited to join the City of Vaughan as we celebrate the official naming of Cortellucci Square!
This Ward 4 park, the first public park to open in the Vaughan Metropolitan Centre, offers a winter skating loop, splashpad and unique playgrounds. There are also benches, trees for shade, a pavilion with accessible restrooms, a community-use room for events and a Zamboni garage.
The only thing sprinkled on the ground this winter should be snowflakes! Littering can make the winter even messier, so we're reminding everyone to take some simple steps to ensure Vaughan stays clean, safe and beautiful.
Join Mayor Steven Del Duca and Members of Council to unveil the new permanent Vaughan Gateway Sign outside Vaughan City Hall (2141 Major Mackenzie Dr.) – which will be accompanied by a menorah during Chanukah.
The event will take place on Tuesday, Dec. 17 from 6:30 p.m. to 7:30 p.m. and feature greetings from Mayor Del Duca and free refreshments. Be sure to dress for the weather!