Block 27 Environmental Assessment
In the plan, it was recommended that the City builds a network of collector roads that considers auto, transit, cycling and pedestrian needs for Block 27 to accommodate both existing residents and new residents to 2031 and beyond. A collector road is a medium-sized municipal street(s) that connect the main street network to the local street network. Collectors are characterized by a balance of access and mobility.
The Block 27 Collector Roads Municipal Class Environmental Assessment will complete the remaining Phase 3 and Phase 4 processes, building on the completion of Phase 1 and Phase 2 conducted through the North Vaughan and New Communities Transportation Master Plan.
Phase 3: Generate alternative designs for the preferred solution from the North Vaughan and New Communities Transportation Master Plan.
Phase 4: Complete the Environmental Study Report, which brings together the existing conditions review, future conditions analysis, alternative solutions and designs, the preferred design solution and implementation and mitigation measures.
Join the conversation!
On Nov. 16, 2022, the City held a live, virtual Public Information Centre to share information with the community about the new local street network planned for Block 27. View the presentation (PDF). Thank you to those who participated!
Project Completion
An Environmental Study Report (ESR) has been prepared to document the study process, consultation efforts and the recommended collector network plan for Block 27. The Notice of Completion places the ESR on public record for review for 30 days beginning October 29th, 2024, and ending November 29th, 2024. The Notice of Completion can be download at the following link. Please review the Notice for details on providing questions and comments on the ESR. Comments and questions can be sent directly to the project team.