Sign In
Normal Size Large Size Largest Size Switch Contrast Accessibility
City of Vaughan
Welcome to the City of Vaughan
Official Website.

QUICKMENU

Use the drop down arrow below to navigate through our site

Search
Advanced Search
  • Print Friendly Icon

Home > Vaughan Metropolitan Centre > Edgeley Pond and Park
Edgeley Pond and Park
Edgeley pond image
Page Content

About Edgeley Pond and Park

Edgeley Pond and Park is the largest open space, City-owned piece of land in the Vaughan Metropolitan Centre (VMC) and is located at the northeast corner of Highway 7 and Jane Street. As the VMC’s first residential neighbourhood, Edgeley Pond and Park will become the heart of the community and a signature amenity for the new downtown.
 
The vision is to build a sustainable open space at the centre of the VMC that will function as a hybrid of vital stormwater management infrastructure and create an innovative public space design. In order to unlock future development potential, retrofitting of the pond is required which will also provide water quality and flood control, and optimize ecological function. 
The key objectives of this important City project are to:  
·         improve stormwater management and stream corridor functional design 
·         improve ecological function and provide functional natural habitats 
·         generate spaces for active and passive recreation 
·         showcase design innovation 
·         plan for strategic phasing and implementation 
·         enable further development of the downtown 
·         deliver a first-of-its kind destination for Vaughan and York Region

The Consulting Team 

The City of Vaughan has retained the award-winning team of DTAH and WSP to deliver the detailed design for the project. 

The Process/Technical Advisory Committee involvement

Design began in October 2016 with completion anticipated for spring 2018. 
The timeline is based on six key goals:
 
Goal 1 – Consultation and outreach (December 2016) 
Goal 2 – Design principles and vision (February 2017) 
Goal 3 – Conceptual design options (May 2017) 
Goal 4 – Schematic design (October 2017)

Goal 5 – Detailed design (December 2017)
Goal 6 - Construction documents (July 2018)

Public presentations  

Edgeley Pond and Park stakeholder meeting Sept. 28, 2017 - presentation (PDF)
Edgeley Pond and Park public meeting Sept. 28, 2017 - board display (PDF)
Edgeley Pond and Park stakeholder meeting April 26, 2017 - presentation (PDF)
Edgeley Pond and Park public meeting April 26, 2017 - board display (PDF)
Edgeley Pond and Park public meeting Feb. 21, 2017 - presentation (PDF)
Edgeley Pond and Park public meeting Feb. 21, 2017 - board display (PDF)

Community consultation

Feedback from the community will be central to the development of the detailed design.
Edgeley Pond and Park online survey results. (PDF)
Edgeley Pond and Park public meeting minutes Sept. 28, 2017 (PDF)
Edgeley Pond and Park stakeholder meeting minutes April 26, 2017 (PDF)
Edgeley Pond and Park public meeting minutes April 26, 2017 (PDF)

Edgeley Pond and Park public meeting minutes Feb. 21, 2017 (PDF)
Edgeley Pond and Park stakeholder meeting minutes Feb. 21, 2017 (PDF)
To provide feedback or comment please email edgeley@dtah.com.
 
 

 Contact Information

 

Development Engineering and Infrastructure Planning
Jennifer Cappola-Logullo
Project Manager

Phone: 905-832-2281 ext. 8433

Email: jennifer.logullo@vaughan.ca

Location:
Vaughan City Hall, Level 200
2141 Major Mackenzie Dr.
Vaughan, ON  L6A 1T1

 

 Additional Resources

 
  • Map of Edgeley Pond and Park (PDF)
 

 Related Links

 
  • Parks Development
  • Planning and Growth Management Portfolio
Page Content 2

City of Vaughan silhouette
© 2023 City of Vaughan. All Rights Reserved.​​
  • NEWSROOM
  • CONTACT US
  • SITE MAP
  • PRIVACY STATEMENT AND TERMS OF USE
  • SUPPORT
  • ACCESSIBILITY
Accessible formats or communication supports are available upon request.